St. Charles Raw Water Intake

Levare’s Patent Pending ESPRS was approved as an alternate piling repair on this project. Use of the ESPRS allowed the contractor to reduce its material and fabrication costs by 50% from the original repair design.

The Contractor was able to complete the demolition of the 9 existing timber piles and install 9 new ESPRS’ in less than 3 days!